Pressure testing on the interval NFPA 10 sets for your cylinder type, with certification for every unit that passes.
This is a structural test of the cylinder itself, separate from what an inspection or recharge covers.
A failed hydrostatic test means the cylinder itself can no longer be trusted under pressure. There’s no partial pass, either the shell holds or it doesn’t.
Not sure when your cylinders were last tested? Test dates are checked as part of routine service.
Schedule TestingThe required interval depends on the extinguisher’s agent and construction, confirmed during service.
Typically tested on a 5-year interval from the manufacture date.
Also generally tested on a 5-year interval, given the higher pressures involved.
Commonly tested on a 12-year interval, longer than water or CO2 units.
Exact intervals vary by manufacturer and cylinder type, verified against the stamped manufacture date at every visit.
Managing a mixed fleet of extinguisher types? Testing intervals are tracked per unit, not guessed at.
Contact Us TodayService is available throughout Fort Myers and the surrounding Lee County communities.
Reviewed by the Fort Myers Fire Extinguishers team. Content reflects current NFPA 10 requirements and Florida fire code standards. Last updated: July 2026.
Request a quote and we’ll confirm which units are due for testing. Most service calls are completed same day or next business day.